Civic Issues
Topics getting the most attention in Rancho Palos Verdes public meetings, ranked by how frequently they are discussed.
3 issues in roads with high priority
Roadway and storm drain construction scheduling
A sinkhole at Hawthorne and Indian Valley reopened and swallowed steel plates last week; Public Works got northbound lanes back open by Saturday and pumped out floodwater during a two-inch storm that briefly closed Palos Verdes Drive South.
PV Drive South and PV Drive East Roadway Projects
The February 25 joint TSC/IMAC meeting on the PV Drive South intersection study is expected to draw a big crowd — roughly 1,000 notification letters are going out — and committee members living in the affected area may need to recuse or disclose to avoid conflict-of-interest claims.
Roundabout Feasibility Study Status
Dan Myers criticized the council for backing away from fixing the poorly designed traffic circles and said illegal turns and speeding continue daily with no enforcement.