HighRoads

Traffic and queuing at the Harvard/Palm intersection

Dutch Bros will replace the vacant old bank building with a 1,025-square-foot drive-through coffee shop, bringing roughly 30 local jobs and enthusiastic social media buzz. Commissioners pressed hard on traffic congestion at the shopping center's four Harvard Boulevard approaches, but the traffic study found no significant impacts.

3 mentions (1 this month)Last discussed Oct 27, 2026
HighRoads

SR-150 Rehabilitation Delays and Road Safety

Caltrans says the suspended SR-150 repaving resumes around December, with paving done by mid-2027. Residents presented photos of missing striping, faded crosswalks, broken sidewalks and ramp hazards — problems Vice Mayor Crosswhite called a safety hazard after her own near head-on collision.

1 mention (1 this month)Last discussed Oct 21, 2026
HighRoads

Pavement management and bridge construction progress

The city awarded its largest-ever annual paving contract — roughly $4 million all-in — to J&H Engineering, with work starting by June 1. Residents have long complained about deteriorating streets and pothole damage, funded by Measure T and Measure R.

7 mentions (1 this month)Last discussed Oct 21, 2026
HighRoads

Telegraph Road widening and corridor congestion

Commissioners pressed on whether two driveways on Telegraph Road can handle the shopping center's traffic, worried about hard left turns toward downtown. Staff said no new traffic light is planned but signal timing is being re-examined at Hallock.

2 mentionsLast discussed Aug 19, 2026
HighRoads

Speeding and traffic safety on Santa Paula Street

A resident whose home was struck by a speeding car in April asked why nine months of requests for traffic calming produced nothing while RV code enforcement moved quickly. Staff pointed to the traffic safety committee process and promised a newsletter item on how residents can request reviews.

2 mentionsLast discussed Jun 17, 2026
HighRoads

Park and Orchard Street Water, Sewer and Paving Project

The city is spending about $1.7 million to replace water and sewer lines and repave the Park and Orchard neighborhood. Only about $440,000 comes from street (Measure R) funds; the rest draws on water and sewer enterprise funds. Construction should begin around June 1 and finish over the summer.