Civic Issues
Topics getting the most attention in Santa Ana public meetings, ranked by how frequently they are discussed.
9 issues in roads
Citywide Residential Permit Parking Study Update
A condo owner told the council the permit system excludes most condo owners and urged delaying expansion of permit zones until the long-delayed parking study is released. The council directed staff to bring an update by the first October meeting, and discussed replacing bumper stickers with hanging placards.
Bike Lane and Lane Reduction Stop Directive (Raitt and First Streets)
Mayor Pro Tem Penaloza asked the council to order Public Works to immediately stop all design and construction of vehicle lane reductions and protected bike lanes citywide, specifically work planned on Raitt Street and First Street. This affects commute times, street safety, and how the city's corridors are built for years to come.
Citywide resident preferential parking study update
The council was scheduled to receive an update on the citywide study of resident permit parking — a program that affects who can park on neighborhood streets.
Bristol Street corridor traffic signal synchronization
Santa Ana would join Costa Mesa and Newport Beach in a cooperative project to sync traffic signals along Bristol Street, reducing congestion on a major regional corridor.
Mejoras de Memory Lane y Flower Street
Un contrato de construcción iba a ser adjudicado a Legion Contractors, Inc. para el proyecto de mejoras de Memory Lane y Flower Street (No. 23-6037) — mejoras de calles y pasos peatonales en esos vecindarios.
Sincronización de señales del corredor de Bristol Street
Santa Ana consideraría asociarse con Costa Mesa y Newport Beach y contratar a Iteris, Inc. para sincronizar las señales de tráfico a lo largo del corredor de Bristol Street — un proyecto que apunta a reducir la congestión y el tiempo de viaje.
Santa Ana Boulevard Grade Separation Project funding
The council approved the agreement that gives the city access to $25 million in federal RAISE grant funds for the Santa Ana Boulevard grade separation, a major rail-safety and traffic project Councilmember Bacerra championed.
Street preventive maintenance contract
The FY 25/26 local street preventive maintenance project was slated for award to Onyx Paving Company, Inc., continuing road resurfacing and repair work across the city.
Residential parking permit placard replacement
Mayor Pro Tem David Penaloza proposed replacing residential parking permit stickers with mirror-hanging placards. The change affects residents in permit districts who currently apply window decals to their vehicles.