Civic Issues
Topics getting the most attention in Sanger public meetings, ranked by how frequently they are discussed.
10 issues in roads with medium priority
Indianola/Jensen traffic signal
Bids came in about 20% under estimate for the long-awaited stoplight, with construction possibly starting in January — final turn-on still depends on PG&E.
Four-way stop and streetlight study at N Street and 10th
Council Member Montelongo pushed for a traffic study toward a four-way stop at Rosson and Magnolia near a school, plus speed feedback in the area; a study runs roughly $3,035.
Street striping on Jensen and citywide
Residents repeatedly complained that faded lane lines on Jensen Avenue are a fog-season safety hazard. Staff is gathering quotes for striping main streets but warned the budgeted amount may not cover it all.
Street Resurfacing Coordination with PG&E
A resident complained PG&E dug up freshly repaved streets shortly after city projects finished, and asked the city to coordinate schedules with PG&E.
Bethel Avenue Right-of-Way Maintenance and Unhoused Concerns
Mayor Pro Tem Martinez flagged overgrown landscaping and unhoused individuals along Bethel north of Church as a safety issue for early-morning walkers; staff will investigate which entity maintains the stretch.
Almond Avenue Reconstruction Completed
The rebuilt Almond Avenue between Bethel and Greenwood is officially done. A resident complained that poles in the sidewalk make it tough for wheelchairs and strollers; the city says a PG&E pole replacement will fix the worst spot.
Neighborhood Traffic Safety Requests
Council Member Montelongo pushed for a traffic study toward a four-way stop at Rosson and Magnolia near a school, plus speed feedback in the area; a study runs roughly $3,035.
Annex and Bethel Signal Delays
A resident said he was told PG&E was holding up the new signals, then saw contractors still wiring them days later, and accused the city of not being straight with him. The city manager said PG&E energized the signals and flashing reds start Monday.
Street Conditions and Pothole Reporting
Residents complained about worn street striping and potholes, suggesting city vehicles carry notebooks to log problems; the mayor countered that 26,000 residents reporting issues could achieve the same thing.
2026 Street Sealing Project
Streets across the city will get a fresh seal coat under a $589,465 contract with Pavement Coatings Co., the lowest of a competitive field of bidders, plus a $59,000 contingency for change orders.