20 issues in roads
Prospect Avenue Traffic Signal and Curb Ramp Replacements
City officials discussed infrastructure upgrades along Prospect Avenue focused on modernizing traffic signals and installing accessible curb ramps to improve pedestrian safety.
Marina Parking Requirement Study
The city is studying whether the rule requiring three-quarters of a parking space per boat slip still reflects real demand. Findings could lead to zoning and coastal plan changes affecting parking at King Harbor — and boaters worry reduced requirements now could hurt them when marinas fill back up.
North Redondo bike network praise
Council Member Obagi celebrated riding protected bike lanes from North Redondo to the beach, calling Redondo the most bike-friendly city in the South Bay.
Riviera Village Pedestrian and Multi-Modal Enhancements
The city accepted a $4 million Metro grant to design and engineer safety and pedestrian upgrades in Riviera Village, improving walkability and streetscapes.
Proposed additional street parking in Golden Hills neighborhood
The commission was scheduled to discuss and possibly act on a proposal to add street parking in the Golden Hills neighborhood. Added parking can change curb access and street congestion for residents, but no outcome is documented.
North Prospect Avenue noise and safety
Resident Darryl Boyd thanked Public Works for planting 20 trees on the North Prospect median but says speeding, loud exhausts and truck traffic continue from Pearl Street to Palos Verdes Boulevard — and residents are organizing regardless of council involvement.
Caltrans PCH improvement project scope at Palos Verdes Boulevard
The Council was slated to discuss recommended changes to Caltrans' scope of work for the PCH improvement project at Palos Verdes Boulevard — a project that affects daily commutes on one of the city's busiest corridors.
Artesia Boulevard Safety Improvements Completed
The Artesia Boulevard safety project was slated to be formally accepted as complete, wrapping up safety upgrades on a busy corridor.
Palos Verdes Boulevard protected bike lanes
A $577,450 change order funds bike lanes, slurry seal, and traffic calming from Pacific Coast Highway to Irena Avenue.
Bicycle Lane Usage and Implementation
Public Works updated the Youth Commission on how bike lanes are being used across Redondo Beach and how the city plans future implementations to improve safety and connectivity.
Avenue G / Palos Verdes Boulevard all-way stop request
Scott Kroll says he's been reporting dangerous conditions at Avenue G and PVB since 2008, has survey data showing 95-100% support, and got a private email from Councilmember Waller admitting 'he dropped the ball.' He asked the council to order a full safety evaluation.
Speed Cushions on Avenue F
Speed cushions were slated for the 300 block of Avenue F between PCH and Palos Verdes Boulevard — a traffic-calming win for that neighborhood.
North Prospect Avenue median and streetscape promises
Daryl Boyd and Mark Nelson said the city manager walked their block but the promised trees, traffic calming and noise fixes still haven't materialized — and they took shots at the mayor and their district councilmember for not engaging.
Opal & Irena Intersection Traffic Calming
Residents near Opal Street and Irena Avenue are concerned about vehicle speeds and cut-through traffic. The commission reviewed potential physical measures to slow cars down and protect neighborhood pedestrians.
Kingsdale Avenue Resurfacing Completion
The Kingsdale Avenue resurfacing project between Grant Avenue and 182nd Street was up for acceptance as complete, with a final $59,103 payment to the contractor after the lien period.
Residential Street Rehabilitation
The City awarded a multi-million dollar contract to repave and repair neighborhood streets across Redondo Beach.
Graduation Parking Suspension
Preferential parking rules in the Vincent and Vincent 2 districts would be suspended for limited hours on June 11 and 12, 2026, so families can park during middle school commencement and high school graduation ceremonies.
PCH & Agate Crosswalk Improvements
Crossing Pacific Coast Highway at Agate Street can be hazardous for pedestrians. Because PCH is a state highway, any crosswalk upgrades require coordination and approval from Caltrans.
Beach Cities Transit Services and Youth Ridership
The transit team reviewed public transportation options available to young people and discussed ways to encourage higher youth ridership on local buses.
Metro C Line Extension Support
The council backed the Hawthorne Alternative for the Metro C Line extension to improve regional transit connectivity.