Civic Issues
Topics getting the most attention in Pittsburg public meetings, ranked by how frequently they are discussed.
6 issues in water utilities
Utility e-billing rebate
The new water billing system forces everyone to re-register online; the $10 credit nudges customers to go paperless, which saves the water fund over $178,000 a year at full adoption. Fixed-income residents flagged the 3.5% online payment fee, and staff confirmed e-billing only changes how the bill is delivered, not how it's paid.
Buchanan Park storm drain improvements
Damaged storm drain pipes and inlets at Buchanan Park were slated for replacement under Project 2705, a $333,625 construction contract with Cratus, Inc. Fixing the failing drain system helps prevent flooding and restores landscaping damaged during construction.
West Santa Fe Avenue sewer and water rehabilitation design
The city planned to pay Hydroscience Engineers an extra $107,534 to finish designing sewer and water line upgrades on West Santa Fe Avenue, bringing the design contract to $811,379.
Water treatment plant consultant contract extensions
Two more amendments to consultant contracts for the big water plant project raised scope-creep concerns; the project remains within budget and schedule per the city manager.
Island Energy rate increases on Mare Island
Ratepayers on Mare Island face a 3% electric increase and a 4.5% gas delivery increase starting September 1 — still far below PG&E. The loss of the dry docks (20% of load) and rising costs drove the increase.
2025 Urban Water Management Plan and Water Shortage Contingency Plan
The council adopted the state-required five-year water plan and drought contingency plan. Staff said Contra Costa Water District supplies about 90% of Pittsburg's water and the city has adequate supply for existing and future customers.