Civic Issues
Topics getting the most attention in Oceanside public meetings, ranked by how frequently they are discussed.
3 issues in water utilities
Buccaneer Force Main engineering
A $208,758 amendment to Ardurra Group's contract would cover added engineering and construction-phase services for the Buccaneer Force Main sewer line.
Harbor sedimentation and shoaling emergency
The local emergency over sediment building up in the Harbor navigation channel continues — it affects boating access and Harbor operations.
Mesa Loma Water Main emergency repairs
The council found the emergency continues on the 18-inch Mesa Loma Water Main, keeping urgent repair work going.