Top issues during term (20)(Roads)
Better Overland Project Phases 1 and 3
Residents cited a roughly $20 million project cost that staff did not fully explain at a Rotary meeting.
Safer Fox Hills Project and Pavement Rehabilitation
Construction cost to be determined by bidding; grant-supported improvements to sidewalks and crossings.
Better Overland and Sepulveda Connects
Better Overland phases are largely grant-funded; phase three has a $350,000 gap and Safer Fox Hills a $2 million gap for minimal viable products.
Sepulveda Connects Conceptual Plan
Not specified at the conceptual-plan stage.
Streamlined public works approvals
Staff say removing the step saves about two months per project, reducing carrying costs.
Comprehensive Mobility Services Plan
Cost and revenue analysis is underway; the city's yard is at capacity, limiting fleet growth.
Parking-Protected Bicycle Facilities
Brighter green should need fewer compliance-driven repaints; both shades currently require maintenance roughly every two years.
Sidewalk repair project headed to bid
The JPA adds about $3 million for street and right-of-way improvements, including sidewalks.
Residential Street Paving Program
$2.4 million contract plus up to $600,000 in change orders and $185,216 in inspection services.
National Blvd safety study and proposed Expo Park
A leaner study scope leaves more of the $355,000 for actual improvements.
Move Culver City Downtown Corridor Construction
About $1.33 million for construction, plus up to $436,889 more in contingency and management authorizations.
Tri-School Area Safe Routes and Neighborhood Greenway on Elenda
Improvements in Concepts B and C are not currently funded and would need their own capital project.
Culver CityBus wheelchair accessibility
Rancho Higuera Neighborhood Traffic Management
Only Concept A-scale work is currently budgeted; larger closures would require new council funding.
Aiona Street protected bike lane dispute
Bike Month and city-bike group partnership
Traffic signal maintenance supplies
Up to $250,000 per year through fiscal year 2030-2031.
Dockless shared micromobility program renewal
Earth Day Open Streets and Walk to School Day
About $14,000 per event, mostly police staffing, funded through the Mobility and Traffic Engineering Special Events Account.
Major transit grant awards
Accepting the Sepulveda grant commits over $216,000 in matching funds for a project whose design hasn't been publicly reviewed.
Decisions during term (0)
Recorded while Puza was in office — not necessarily decisions they moved, spoke to, or voted on.
No decisions found matching Roads.
Voting record (0)(Roads)
No votes found matching Roads.