Filtered to Roads

Top issues during term (20)(Roads)

high↑Jan 2026[54]

Better Overland Project Phases 1 and 3

Residents cited a roughly $20 million project cost that staff did not fully explain at a Rotary meeting.

high↑Mar 2026[30]

Safer Fox Hills Project and Pavement Rehabilitation

Construction cost to be determined by bidding; grant-supported improvements to sidewalks and crossings.

high↑Feb 2026[21]

Better Overland and Sepulveda Connects

Better Overland phases are largely grant-funded; phase three has a $350,000 gap and Safer Fox Hills a $2 million gap for minimal viable products.

high↑Oct 2026[20]

Sepulveda Connects Conceptual Plan

Not specified at the conceptual-plan stage.

medium↑Oct 2026[10]

Streamlined public works approvals

Staff say removing the step saves about two months per project, reducing carrying costs.

high↓Sep 2026[8]

Comprehensive Mobility Services Plan

Cost and revenue analysis is underway; the city's yard is at capacity, limiting fleet growth.

high↓Mar 2026[6]

Parking-Protected Bicycle Facilities

Brighter green should need fewer compliance-driven repaints; both shades currently require maintenance roughly every two years.

high↓May 2026[6]

Sidewalk repair project headed to bid

The JPA adds about $3 million for street and right-of-way improvements, including sidewalks.

medium↓Sep 2026[5]

Residential Street Paving Program

$2.4 million contract plus up to $600,000 in change orders and $185,216 in inspection services.

high↓Sep 2026[5]

National Blvd safety study and proposed Expo Park

A leaner study scope leaves more of the $355,000 for actual improvements.

high↓Jan 2026[3]

Move Culver City Downtown Corridor Construction

About $1.33 million for construction, plus up to $436,889 more in contingency and management authorizations.

high↓Mar 2026[3]

Tri-School Area Safe Routes and Neighborhood Greenway on Elenda

Improvements in Concepts B and C are not currently funded and would need their own capital project.

medium↓Jun 2026[2]

Culver CityBus wheelchair accessibility

high↓May 2026[2]

Rancho Higuera Neighborhood Traffic Management

Only Concept A-scale work is currently budgeted; larger closures would require new council funding.

medium↓Jun 2026[2]

Aiona Street protected bike lane dispute

low↓Jun 2026[2]

Bike Month and city-bike group partnership

low↓May 2026[2]

Traffic signal maintenance supplies

Up to $250,000 per year through fiscal year 2030-2031.

low↓May 2026[2]

Dockless shared micromobility program renewal

medium↓Feb 2026[1]

Earth Day Open Streets and Walk to School Day

About $14,000 per event, mostly police staffing, funded through the Mobility and Traffic Engineering Special Events Account.

medium↓Jan 2026[1]

Major transit grant awards

Accepting the Sepulveda grant commits over $216,000 in matching funds for a project whose design hasn't been publicly reviewed.

Decisions during term (0)

Recorded while O'Brien was in office — not necessarily decisions they moved, spoke to, or voted on.

No decisions found matching Roads.

Voting record (0)(Roads)

No votes found matching Roads.